Pinterest • El catálogo global de ideas

Explora Para Data, Racks Y Gabinetes, ¡y mucho más!

Soluciones de cableado preterminado para Data Center

It was an achievement 2 years in the making, as IBM’s Sequoia super computer leapfrogged Fujitsu’s K computer to return to the number 1 spot in global computing.

Small, efficient patch panels. Evenly spaced and nice bends throughout.

3850X access switches with a VSS pair of 4500X distribution switches. 2921 for SRST and 911 call out. Access switches are balanced across the bottom two 2200VA UPS with the third carrying the 4500X pair, 2921 and analog DVR. The gap mid rack is for a 2U horizontal cable manager that hadn't been delivered yet. All switches are uplinked via 10G redundant links.

Cableporn (sorry for some reason app turns pic sideways)

Gave one of our cabs a long overdue tidy

Wiring up a middle school. They did a great job. White is data, Green is Voice, Blue is Access Points, and Orange is Fiber.